Egan Company
Projects

Target Center Renovation -
Network Replacement

A SLAM DUNK OF A NETWORK UPGRADE

PROJECT:

Target Center Renovation - Network Replacement

LOCATION:

Minneapolis, Minnesota

BUILDING TYPE:

Sports & Entertainment

EGAN EXPERTISE:

Technology Systems // Network Upgrades // Technology Center

PROJECT TEAM:

Mortenson Construction
City of Minneapolis
AEG Facilities

PROJECT FACTS:

Project was completed in October 2017.

SPECIALTIES FEATURED WITH THIS PROJECT:

Building Technology Integration

  • Target Center, a multi-purpose arena home to the NBA’s Minnesota Timberwolves and the WNBA’s Minnesota Lynx, completed extensive renovations in 2017 that have added 20 years to the arena’s lifespan.
  • Egan’s technology team provided network design, programming, and installation services of the network equipment in the arena.
  • The new network data equipment was built and hosted at Egan’s Champlin facility which allowed the team to fully configure the system and test the equipment in Egan’s Technology Center before installation at Target Center.
  • In addition, Egan’s team designed and configured the data network to function at a higher level which allows thousands of users to simultaneously utilize the system. In the event of an internet provider’s loss of signal, a backup signal will take over without a noticeable outage to users.