Mystic Lake Hydronics
ENHANCING ELECTRICAL EFFICIENCY AT MYSTIC LAKE CASINO
PROJECT:
Mystic Lake Hydronics
LOCATION:
Prior Lake, MN
BUILDING TYPE:
Casino / Gaming, Hotel, Housing & Hospitality
EGAN EXPERTISE:
Hydronics, Electrical Systems, Paralleling Switchgear, Switchgear, Building Automation Systems (BAS)
PROJECT TEAM:
PCL Construction
HGA Architects and Engineers
PROJECT FACTS:
The project was completed in October of 2024.
SPECIALTIES FEATURED WITH THIS PROJECT:
Electrical Construction, Building Automation
- Mystic Lake Casino is a frequented spot for entertainment, gaming, and events, attracting visitors from across the region.
- The building’s electrical equipment was updated with new, more efficient systems, including updated switchgear and a modern cable bus system with Egan Company’s Electrical team leading the upgrades.
- The project included expanding the Central Utility Plant with new equipment, such as a heat trace system, upgraded power supplies, and backup power systems to ensure the facility stays up and running smoothly.
- This project required detailed planning for critical cutovers, power transfers, and managing potential outages, to ensure minimal disruption.
- Additionally, Building Automation System (BAS) upgrades were completed by Egan’s Building Automation team.
- Engineered control drawings for each mechanical system were expertly designed to ensure seamless integration.