Mystic Lake Hydronics

ENHANCING ELECTRICAL EFFICIENCY AT MYSTIC LAKE CASINO

PROJECT:

Mystic Lake Hydronics

LOCATION:

Prior Lake, MN

BUILDING TYPE:

Casino / Gaming, Hotel, Housing & Hospitality

EGAN EXPERTISE:

Hydronics, Electrical Systems, Paralleling Switchgear, Switchgear, Building Automation Systems (BAS)

PROJECT TEAM:

PCL Construction
HGA Architects and Engineers

PROJECT FACTS:

The project was completed in October of 2024.

SPECIALTIES FEATURED WITH THIS PROJECT:

Electrical Construction, Building Automation

  • Mystic Lake Casino is a frequented spot for entertainment, gaming, and events, attracting visitors from across the region.
  • The building’s electrical equipment was updated with new, more efficient systems, including updated switchgear and a modern cable bus system with Egan Company’s Electrical team leading the upgrades.
  • The project included expanding the Central Utility Plant with new equipment, such as a heat trace system, upgraded power supplies, and backup power systems to ensure the facility stays up and running smoothly.
  • This project required detailed planning for critical cutovers, power transfers, and managing potential outages, to ensure minimal disruption.
  • Additionally, Building Automation System (BAS) upgrades were completed by Egan’s Building Automation team.
  • Engineered control drawings for each mechanical system were expertly designed to ensure seamless integration.