PROJECT FACTS:

Egan’s scope of work was completed in June 2024 // Facility will be operational in early 2025

SPECIALTIES FEATURED WITH THIS PROJECT:

Electrical Construction, Fire/Life Safety

  • FedEx is opening a 570,000 square foot distribution center in Rosemount, Minn. to improve the intake, handling, and delivery of packages throughout the Twin Cities.
  • In a Design/Build role, Egan’s Electrical Construction team installed four electrical services, eight feeders for future panels, and generator connection cabinets with kirk key interlocks to support backup power needs in the event of outages.
  • Additionally, Egan’s Fire/Life Safety team installed alarm systems throughout the facility.
  • The facility also includes 178 dock doors and 16 drive-in doors, for which Egan installed power, lighting, and controls.
  • To plan for future electric fleets, Egan designed and installed the service for 162 Level 2 electric vehicle chargers, as well as bus ducts for future interior charging capabilities.
  • All of the electrical panels were prefabricated by Egan’s Electrical Fabrication team in Southern Minnesota.