Egan Company

Energy Client – Self-Contained Utility Rooms

RECYCLING SOLUTION FOR RENEWABLE ENERGY PROS

PROJECT:

Energy Client – Self-Contained Utility Rooms

LOCATION:

Conshohocken, PA

BUILDING TYPE:

Power/Energy

EGAN EXPERTISE:

Engineering/Design // Control Systems // Power Distribution // Motor Control // Lighting // Fire Alarm // Cooling Systems

PROJECT TEAM:

Wolf Material Handling Systems

PROJECT FACTS:

Completed November 2015 // Design/Build Project

SPECIALTIES FEATURED WITH THIS PROJECT:

Electrical // Mechanical // Building Technology and Systems Integration

  • Egan’s team of mechanical, electrical, and control system experts partnered with Wolf Material Handling Systems to come up with an innovative idea that incorporated two of Egan’s strengths: safety and prefabrication.
  • Decommissioned shipping containers were utilized to create two self-contained utility rooms while providing the energy client with a power distribution center (PDC), a motor control center (MCC), and a large air compressor.
  • Because the utility rooms were self-contained, equipment was insulated from any damaging materials that might be encountered at the customer’s facility, a major priority for the customer.
  • All work was completed within Egan’s facility on a fast-tracked schedule of about two months upon the arrival of the containers, and then shipped to the customer when finished and ready for installation.
  • Features like fire alarm, air-conditioning, and LED lighting were also included.