Confidential Global Corporation

SUBSTANTIAL ELECTRICAL UPGRADES PERFORMED WITHOUT INTERRUPTION

PROJECT:

Confidential Global Corporation

LOCATION:

Minnesota

BUILDING TYPE:

Office Building

EGAN EXPERTISE:

Electrical Systems

PROJECT TEAM:

Confidential

PROJECT FACTS:

Completed in May 2019

SPECIALTIES FEATURED WITH THIS PROJECT:

Electrical

  • In a Design/Build role, Egan’s electrical team removed and replaced three existing 2000 KVA Xcel Energy transformer services at a confidential global corporation.
  • The existing services were replaced with two 2500 KVA substations, MTM, and a new Fire Pump substation.
  • The team’s scope included rebuilding the existing services with custom lineups inside the electrical vault using 3200 amp breakers with maintenance mode to achieve a sub 40 cal energy. This was done so breakers and switches in the gear downstream could operate safely.
  • Egan performed a series of cutovers into the new gear while the facility was fully occupied. Zero interruption to business occurred during this project.