Egan Company
Projects

InterContinental Hotel at MSP International Airport

FIRST HOTEL CONNECTED TO MSP IS COMPLETE

PROJECT:

InterContinental Hotel at MSP International Airport

LOCATION:

St. Paul, MN

BUILDING TYPE:

Housing & Hospitality

EGAN EXPERTISE:

Electrical Installation, Design/Build, Fire/Life Safety, Curtainwall, Curtainwall Skyway Bridge, Prefabrication, custom-frit patterned glass

PROJECT TEAM:

PCL Construction
Graves Hospitality/Intercontinental Real Estate Company
RSP Architects

PROJECT FACTS:

Project completed in June 2018 // The InterContinental at Minneapolis-St. Paul International Airport opens August 2018 //

SPECIALTIES FEATURED WITH THIS PROJECT:

Electrical, InterClad, Building Technology Integration

  • The InterContinental at Minneapolis-St. Paul Airport (MSP), the first hotel attached to MSP is 12-stories and consists of 300 guestrooms, multiple meeting rooms, a ballroom, and three restaurants.
  • In a Design/Build role, Egan’s electrical team was utilized to provide a complete electrical system installation.
  • A fire/life safety system was provided along with the design and installation of a TSA Security Checkpoint directly adjacent to the skyway bridge.
  • Egan’s InterClad team installed 36,000 square feet of curtainwall on the hotel and included LED lights in part of the curtainwall.
  • Sound performance glass was utilized to ensure sound proofing due to close proximity to the airport runways.
  • The InterClad team also installed 13,000 square feet of curtainwall and custom-frit patterned glass along the skyway bridge that connects the hotel with Concourse A.