Egan Company

Minneapolis Water Treatment Facility

H2 GO: PROVIDING WATER TO MINNEAPOLIS

PROJECT:

Minneapolis Water Treatment Facility

LOCATION:

Fridley, Minn.

BUILDING TYPE:

Government & Civic

EGAN EXPERTISE:

Electrical, Medium Voltage, Panel Shop, Pipefitting, Tinning

PROJECT TEAM:

City of Minneapolis

PROJECT FACTS:

Project was completed in September 2024

SPECIALTIES FEATURED WITH THIS PROJECT:

Electrical Special Projects, Mechanical, Industrial Controls

  • The City of Minneapolis upgraded its water treatment facility in Fridley, Minn. that provides water to approximately half a million residents in Minneapolis, Fridley, and Brooklyn Park.
  • Egan Company’s Electrical Special Projects team provided their expertise for the renovations to Pump Stations 3 and 5, including new electrical services, duct bank, Medium Voltage expertise, cable trays, and underground conduit.
  • Conduit, devices, wiring, terminations, and integration for the controls of the pump station #5 and the generator control system were completed by Egan’s Industrial Controls team.
  • Wire labels for the controls system were done in Egan’s UL 508A panel shop.
  • Electrical services and infrastructure were moved from a flood plain by the river to flood-resistant higher ground.
  • New 6-ton cooling rooftop units with duct-mounted steam coils were installed by Egan’s Mechanical team, in addition to new steam unit heaters, a battery room exhaust fan, and a 3-ton split heat pump system.
  • The facility can treat up to 135 million gallons of water per day.